Rekordbox eq panel crash

建廷 劉

Official comment

Avatar

No, that's working normally - when your mixer is configured in EXTERNAL MODE, you don't have any of those controls within rekordbox as you use the hardware to perform all of those functions. You can hide the mixer section.

If you have the DJM disconnected, the controls WILL become available to you.

Pulse
Comment actions Permalink

Post is closed for comments.

2 comments

0
Avatar

things are like this:

I got a pioneer 900-nxs mixer

I've already known my eq panel would be locked with USB cable connected to my mixer so I have to go on my 900-nxs eq knobs for adjustment

but, it's kinda weird that my eq panel is still locked with USB cable not connected with the mixer

this just happened recently. 

I still remember that it was like a month ago that it's all normal. (No matter it was USB cable connected or not, eq panel would follow the detection to decide whether it should be locked or unlocked)

I did follow the Rekordbox upgrade 

Is there any way to fix it?

建廷 劉 0 votes
Comment actions Permalink